The Steel Bridge team is composed of a number of dedicated students who work together and collaborate in order to produce a model Steel Bridge capable of challenging other colleges.
The Fall Semester consists of the design work where teammates create and evaluate their own designs. At the end of the sememster, a final design is chosen which will represent the team for the rest of the year.
The Winter and Spring Semesters consist of the fabrication as well as the construction of the bridge. As the bridge is completed, multiple test runs are staged in order to be ready for the competition at the end of the schoolyear.
Remember to complete the following in order to help construct the bridge!
Click Registration and Contacts, then fill out Liability Waiver for Physical Activity
Navigate to the Related Links on the top right side of the screen and click EHS Online Training
3) Attend a Basic Shop Safety Demo hosted by Steve Beard in his shop
Email Ryan Morrisey at ryanem@udel.edu to schedule a time.
|